How to Eliminate the Paper Traveler in Your MEP Fabrication Shop MEP fab shops eliminate the paper traveler by moving each traveler’s contents into a digital work order. That means the drawing, cut list, routing and sign-offs, opened by scanning a barcode or QR label at every station. Fabricators see the current revision on a […]
MSUITE RELEASES MSUITE FAB 4.0
MSUITE FAB 4.0 Documents Progress as It Happens, with Connected Records, Shipping Traceability, and Faster Shop Workflows File and photo attachments, joint logs from bills of lading, combined BOMs, bulk rejection on mobile, and stronger administrative controls help MEP fabrication shops keep records connected and production moving. NOV. 17, 2026 — DEWALT Construction Technology today […]
MSUITE RELEASES DEWALT BIM 10.0
MSUITE BIM 10.0 Delivers Smarter Spooling, Live Fabrication Visibility, and a Direct Path from Hangers to the Shop Custom spool naming, status-based spool management, live FAB tracking, direct hanger-to-FAB connectivity, and Revit 2027 support help MEP contractors get accurate spools to the shop faster. NOV 17, 2026 — DEWALT Construction Technology today announced MSUITE BIM […]
BIM-to-Fabrication Workflows: How Design, Shop and Field Teams Stay Coordinated
MEP contractors keep design, shop and field teams coordinated by running all three from one released model. Work moves in dated packages, and status flows both ways: model data goes down to the shop, and production and install status comes back up. The model is rarely the problem. Most BIM-to-fabrication breakdowns happen between teams, when […]
Pipe Fabrication in 2026: The Process, the Shop Workflow and the Software That Runs It
Pipe Fabrication in 2026: The Process, the Shop Workflow and the Software That Runs It Data center cooling loops, chilled water plants, process piping for chip fabs and power: the work that keeps mechanical and industrial contractors busy runs on pipe. The crews to install it are getting harder to find. Associated Builders and Contractors […]
How to Use BIM Data to Improve Fabrication Shop Capacity Planning
A full backlog feels like good news until three projects need their spools in the same two weeks. Most MEP contractors have plenty of work on the books. Associated Builders and Contractors put average contractor backlog at 8.7 months in September 2026, and contractors with data center work averaged 11.3 months. Backlog tells you how […]
How Fabrication Software Helps Trade Contractors Meet Aggressive Data Center Timelines
Data center work pays well and moves fast, and it gives MEP subcontractors very little room to recover from a bad week. Through September 2026, U.S. data center construction starts reached $135.8 billion across 178 projects, according to ConstructConnect. Data centers account for 27% of all nonresidential building starts this year, and the full-year total […]
How to Run a Successful Fabrication Software Pilot: Lessons from Construction Contractors
Most mechanical contractors have been burned by software at least once. A slick demo. A big rollout. Then six months later, the shop is back on paper and spreadsheets. In one survey of more than 1,000 construction professionals cited by Autodesk, 37% said their company bought software in the past year that it never adopted. […]
How Prefab Construction Technology Reduces RFIs and Change Orders on MEP Projects
How Prefabrication Construction Technology Reduces RFIs and Change Orders on MEP Projects. Every RFI costs something. Somebody has to write it, somebody has to answer it and a crew often waits in between. Multiply that across a project and the numbers get big fast. A Navigant Construction Forum study of 1,362 projects found an average of […]