MSUITE BIM 10.0 Delivers Smarter Spooling, Live Fabrication Visibility, and a Direct Path from Hangers to the Shop Custom spool naming, status-based spool management, live FAB tracking, direct hanger-to-FAB connectivity, and Revit 2027 support help MEP contractors get accurate spools to the shop faster. NOV 17, 2026 — DEWALT Construction Technology today announced MSUITE BIM […]
BIM-to-Fabrication Workflows: How Design, Shop and Field Teams Stay Coordinated
MEP contractors keep design, shop and field teams coordinated by running all three from one released model. Work moves in dated packages, and status flows both ways: model data goes down to the shop, and production and install status comes back up. The model is rarely the problem. Most BIM-to-fabrication breakdowns happen between teams, when […]
How to Use BIM Data to Improve Fabrication Shop Capacity Planning
A full backlog feels like good news until three projects need their spools in the same two weeks. Most MEP contractors have plenty of work on the books. Associated Builders and Contractors put average contractor backlog at 8.7 months in September 2026, and contractors with data center work averaged 11.3 months. Backlog tells you how […]
From 60 Spools a Day to 300: What BIM Automation Software Did for Brandt Companies
Brandt Companies increased spool sheet output from roughly 60 sheets per day to over 300 by connecting BIM-to-FAB workflows in Revit with MSUITE, a 5x improvement in spooling productivity achieved with the same detailing team. The gain came from automating spool generation, tagging, and cutting-list creation directly inside Revit, then feeding that data straight into […]
The BIM-to-FAB-to-Field Checklist Every MEP Contractor Needs
Featured Summary A BIM-to-FAB-to-Field checklist is a structured set of handoff requirements that govern how information moves from the coordinated model, through the fabrication shop, to field installation. It defines what data must transfer at each stage, who owns the handoff, and what triggers the next step — closing the gaps where rework, delays, and […]
Why the Most Successful Data Center Builders Run on a Connected BIM-to-FAB-to-Field Operating System
Key Takeaways for Data Center Builders AI and cloud growth are creating unprecedented demand for data center capacity. Fabrication alone is no longer enough to meet aggressive delivery schedules. Leading contractors connect BIM, fabrication, logistics, and field installation in a single workflow. Real-time production visibility improves schedule certainty and labor productivity. A connected BIM-to-FAB-to-Field platform […]
BIM Automation: How MEP Fabrication Teams Cut Spooling Time by 70% and Scale Output
BIM automation is software that handles repetitive detailing tasks like spool creation and hanger placement automatically, letting MEP teams cut spooling time by up to 70% without adding headcount. Leading MEP and Industrial contractors are using BIM software to multiply detailing capacity, accelerate fabrication, and meet growing project demand without proportional increases in labor. The […]
MSUITE Releases BIM 9.2
MSUITE BIM 9.2 Offers Smarter Hanger Workflows, Native Clash Detection, and a New Standard for MEP Coordination in Revit Native clash detection inside Revit, advanced hanger automation, dockable workflow managers, and fabrication-ready exports help MEP contractors improve coordination and scale production. May 28, 2026 — MSUITE today announced the release of MSUITE BIM 9.2, […]
What Is BIM MEP? How It Improves Coordination, Fabrication, and Project Delivery
Building Information Modeling (BIM) is revolutionizing the construction industry. It integrates various systems into a cohesive digital model. Among these systems, MEP—Mechanical, Electrical, and Plumbing—plays a crucial role. BIM MEP enhances the design and coordination of these systems. This integration leads to improved efficiency and reduced errors in construction projects. BIM technology provides a digital […]
How BIM Improves Pipe Spool Fabrication and Shop Production
For mechanical contractors and fabrication shops, the gap between a coordinated BIM model and a finished pipe spool has traditionally been measured in days of manual work: dimensioning, tagging, creating shop drawings, and translating design intent into production-ready packages. That gap is now closing. With the right BIM-to-fabrication workflow, what used to take days takes […]