McKinstry is Changing the Game
Team McKinstry implemented MSUITE to solve two challenges relating to improving fabrication shop productivity insights and gain a deeper connection between VDC and Fabrication teams. McKinstry’s Shop leadership team needed greater visibility on production to improve productivity and communication.
“We selected MSUITE because it provided the greatest fidelity into our shop operations and the strongest link between VDC and Fabrication teams,” said CJ Best Director Of Manufacturing at McKinstry.
In this Case Study
- Situational Analysis
- Industry Goals
- Moving from Spreadsheet to Automation
- Productivity Performance
- Connecting Design to the Shop
- Doing more for their clients